Papa Terra Field Development

For all 8 piles, the 128 tendon strings and 8 Buoyancy Modules (11.000T), Jumbo’s scope of work included the project management, engineering, load-out & sea-fastening (Morgan City US), onward transportation to Brazil and on-site tandem lifting (from own deck), upending and hand-over to the Main Installation Vessel (DB-50).