With our track record and technical expertise, we have built a solid reputation as a reliable and cost efficient provider of transport and installation solutions.

Jumbo

Pierce Field Lifetime Extension

Replacement of Haewene Brim FSPO Mooring System

Read more
Greater Gabbard Jumbo Javeline

Greater Gabbard OWF

Transport and installation of the first Offshore Wind Farm Project

Read more
HLV Fairplayer installs 16 Subsea Manifolds in Australia

Wheatstone

Heavy lift installation of Subsea structures in Western Australia

Read more
Jumbo

Papa Terra Field Development

Tension leg wellhead platform (TLWP)- piles and tendons installation (support).

Read more
Fairplayer loads piles at Western Isles project

Western Isles Development Project

Installation of Sevan FPSO mooring piles and ground chains.

Read more
Fairplayer Offshore for Stella field development project

Greater Stella Area Development

Provision of FPSO (FPF-1) mooring system installation.

Read more
Jumbo

Turkey-Cyprus Water Supply Project

Transport and installation of subsea (crossing) suspension system.

Read more
Fairplayer Jumbo PEtroSA MEG Riser

Ikhwezi Field Development

Subsea installation of MEG Riser for Ikhwezi Field development.

Read more
Jumbo Javelin OWP Butendiek Development

OWP Butendiek Development

Installation of 80 transition piece foundations.

Read more
Anholt Offshore Windfarm Development

Anholt Offshore Windfarm Development

Transportation and offshore installation of 111 Transition Pieces for Anholt Offshore Windfarm Development

Read more
EnQuest Phase 1 FPSO mooring system installation

Provision of FPSO Mooring System installation for EnQuest

Utilizing its enormous hold and the 900t mast cranes, our Fairplayer took all equipment onboard for onward transit to site and offshore installation

Read more
EnQuest Phase 2 FPSO Tow Out Hook Up and Installation

FPSO tow out, hook-up and installation for EnQuest

The EnQuest producer was towed from Port of Tyne to the field. At arrival in the field, the FPSO was positioned above the mooring and the chains were pulled and hooked into the FPSO.

Read more