View media
Trackrecord

FLNG Hilli Episeyo

The scope of work comprised the load-out, transport and offshore installation of the FLNG soft yoke mooring system.
Including pile driving, grouting and the installation of import riser and control umbilical.

Share this page
  • Share this on Twitter
  • Share this on Facebook
  • Share this on LinkedIn
  • Send this by Email
  • Direct link