Transport, Installation Moheshkhali FSRU Mooring system

The scope of work comprised the load-out, transport and offshore installation of FSRU mooring system components consisting of 8-off anchor piles including installation of 8-off bottom chain segments and a PLEM and PAD landing structure for the turret (PLUG). Furthermore, Jumbo installed over 150 pcs rock bags for scour protection around the subsea structures.

Download the FSRU Moheshkhali specifications.

Related projects

monopile removal works yunlinDecommissioningNewsOffshore
June 6, 2024

Jumbo Offshore wraps up monopile removal works in Taiwan

PRESS RELEASE | 6 JUNE 2024 Jumbo Offshore wraps up monopile removal works in Taiwan Jumbo Offshore has completed the removal of two monopiles on the Offshore Wind Farm (OWF)…
Petrobras torpedo torpedo pile mooring systemOffshore
September 2, 2022

Jumbo Offshore completa pela primeira vez a instalação do sistema de ancoragem de torpedos da Petrobras

COMUNICADO DE IMPRENSA | 01 SEPTEMBER 2022 Jumbo Offshore completa pela primeira vez a instalação do sistema de ancoragem de torpedos da Petrobras. Jumbo Offshore completa pela primeira vez a…
Close Menu