View media
Trackrecord

OWP Butendiek Development

The scope of work comprised of the project management, engineering, inshore loading (Aalborg), offshore transport and installation onto pre-installed Mono Piles of 80 Transition Pieces. Jumbo’s detailed scope also included the design and supply of all installation aids, lifting gear, grillages and sea fastenings.

Download the OWP Butendiek development project specifications.

 

Share this page
  • Share this on Twitter
  • Share this on Facebook
  • Share this on LinkedIn
  • Send this by Email
  • Direct link