OWP Butendiek Development

By April 1, 2022No Comments
RENEWABLES

OWP Butendiek Development

JUMBO JAVELIN | AALBORG

Home » OWP Butendiek Development

The scope of work comprised of the project management, engineering, inshore loading (Aalborg), offshore transport and installation onto pre-installed Mono Piles of 80 Transition Pieces. Jumbo’s detailed scope also included the design and supply of all installation aids, lifting gear, grillages and sea fastenings.

Download the OWP Butendiek development project specifications.

Related projects

OWF ARKONA Becken SüdostRenewables
February 18, 2018

Jumbo completes project for the Arkona offshore wind farm

RENEWABLES Jumbo completes project for the Arkona offshore wind farm FAIRPLAYER | ARKONAEarlier this year Jumbo completed their project for the Arkona offshore wind farm (E.ON and Statoil). The entire…
Renewables
April 19, 2015

Anholt offshore windfarm development

RENEWABLES PROJECT Anholt offshore windfarm development JUMBO JAVELIN | DENMARKThe scope of work comprised of the project management, engineering, inshore loading (Aalborg), offshore transport and installation onto pre-installed Mono Piles…
Close Menu