View media
Trackrecord

OWF ARKONA Becken Südost

The scope of work comprised of the project management, engineering, inshore loading (Sassnitz), offshore transport
and installation of 60 Transition Pieces onto pre-installed Mono Piles. Jumbo’s detailed scope also included the design
and supply of all installation aids, lifting gear, grillages and sea fastenings.

Share this page
  • Share this on Twitter
  • Share this on Facebook
  • Share this on LinkedIn
  • Send this by Email
  • Direct link