Skip to main content
Projects

IKHWEZI field development

By March 17, 2023No Comments

IKHWEZI field development

Subsea installation of Meg Riser

Home » IKHWEZI field development

Scope of work

Project Comprised of the project management, engineering, pre-survey, preparations at FA Platform, loadout of 3” flexible MEG riser and protection/stabilisation mattresses at Cape Town, offshore transport and installation (J-tube pull-in), protection and stabilization of MEG riser at FA Platform.
Location South Africa, Bl 9, F-A (40 nm south of Mosselbay
Water depth 100 m
Client/Operator PetroSa
Award date
Installation date
Q4 2014
Q1 2015
SIMILAR PROJECTS

Load-out, transport and installation

The scope of work comprises the receipt, marshalling and preparation for installation of mooring components. Load-out, transport and installation of 24-off T-120 torpedo mooring pile and bottom chains. Components for Riser and Umbilical mooring system consisting of 11-off T- 35 torpedo mooring pile and bottom chains.

Phase 2

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Phase 3

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Technical data

Quantity / Size / Weight • 3” x 450 m flexible MEG riser
• Protection/Stabilization mattresses (60 off)

Equipment Resources

Installation Vessel

Key Equipment

HLCV Fairplayer
• 120 t Reel Drive System (Aquatic)
• 50 t two-track Tensioner
• Chute
• ROVs (1 off Work off OBS Class)
• Survey spread
• Platform Winch
MORE ABOUT THE VESSEL
WANT TO KNOW MORE?
CONTACT US

SHARE THIS PROJECT

Video highlights of the project

Related projects

COMPLETED IN 2021

Jumbo Yunlin Transport Scope

40 monopiles, 120 monopile sections and 40 transition pieces

Yunlin Offshore Wind Farm

Taiwan Strait, Taiwan

MORE INFO

COMPLETED IN 2021

Maximizing transport for DEME offshore

Monopile and transition piece transport, 37 voyages

Hornsea Two Offshore Wind Farm

North Sea

MORE INFO

COMPLETED IN 2018

The Arkona offshore wind farm project

Transportation and installation of the 60 transition pieces

385MW Offshore wind farm

German Baltic Sea

MORE INFO

DO YOU HAVE
ANY QUESTIONS?

Please contact our specialist
Close Menu