Greater Gabbard OWF

JUMBO JAVELIN | UNITED KINGDOM

Home » Greater Gabbard OWF

The scope of work comprised of the Transport and Installation of 131 Transition Pieces onto pre-installed Monopiles, including the levelling and grouting. Each trip the Jumbo Javelin loaded nine 280t TP’s including the associated grout quantity. At location each TP was placed onto the Monopile in a specified orientation and levelled to its final position. To fixate the TP, the annulus was filled with grout.

Download the Greater Gabbard Offshore Wind Farm project specifications.

Related projects

OWF ARKONA Becken SüdostRenewables
February 18, 2018

Jumbo completes project for the Arkona offshore wind farm

RENEWABLES Jumbo completes project for the Arkona offshore wind farm FAIRPLAYER | ARKONAEarlier this year Jumbo completed their project for the Arkona offshore wind farm (E.ON and Statoil). The entire…
Renewables
April 1, 2022

OWP Butendiek Development

RENEWABLES OWP Butendiek Development JUMBO JAVELIN | AALBORG The scope of work comprised of the project management, engineering, inshore loading (Aalborg), offshore transport and installation onto pre-installed Mono Piles of…
Close Menu