View media
News archive

First time for everything! Jumbo installs and upends a VLS Tower for Huisman

At Jumbo we like to push ourselves to try new approaches and solutions for our clients. This project was the first time that Huisman (and Jumbo) installed a VLS tower outside their own yard and upended it with a Heavy lift vessel (HLV).

THE CHALLENGE

Huisman required us to load a 1200t vertical lay system (VLS) and various general cargo at their yard in Schiedam and transit to the VARD shipyard in Suapé, Brazil.

In Brazil, our MV Fairmaster and her crew moored alongside the EP-10 newbuild hull to discharge, install and upend the VLS tower. Here, we also discharged and installed various Flex-lay equipment and two pieces for knuckle boom cranes. Watch the video above to see all of this in action!

FLEX-LAY

Over the years, Huisman has designed and delivered a large number of Flex-lay systems. The Flex-lay method combines capabilities for the installation of flexible pipelines, risers and in-line structures. Flex-lay systems offer an efficient pipe-lay method with a specific advantage: the installed pipelines are less sensitive to fatigue and therefore require less complex installation and Abandonment & Recovery procedures.

THE JUMBO ADVANTAGE - SMART SHIPPING. NO SURPRISES

What Jumbo brings to these projects is the expertise of our operators and engineers. Inventive yet safe and efficient ways to ship and install cargoes of all shapes and sizes are engineered on a daily basis at Jumbo. For this project, we worked closely with our client to create a highly customised solution. The added complexity of upending the tower abroad instead of at the shipyard meant smart logistics planning, design and engineering were essential.

If you have any inquiries concerning projects or shipments with Flex-lay equipment please contact the Jumbo Shipping Team.

Share this page
  • Share this on Twitter
  • Share this on Facebook
  • Share this on LinkedIn
  • Send this by Email
  • Direct link