Greater Stella Area Development

The scope of work comprised of the engineering, onshore marshalling, inshore loading (Rotterdam), offshore transport and installation, including pre-tensioning, of all mooring lines at location. Each mooring line consisted of several chain/tri-chain sections, shackles, tri-plates, H-links and spiral strand wires (SSWs) connected to a mooring pile driven into the seabed. In addition a SAL anchor pile is installed.

Download the Greater Stella Area Development project specifications.

 

Share this page
  • Share this on Twitter
  • Share this on Facebook
  • Share this on LinkedIn
  • Send this by Email
  • Direct link

Fairplayer at sea with Stella mooring installation equipment

Jumbo completes Ithacas Stella FPF1 mooring system

This September, Jumbo completed the mooring system pre-installation for the Greater Stella Area (GSA) development as main contractor for Ithaca Energy. Jumbo was managed by Costain Upstream, the subsea project management contractor for the GSA development.

Read more
Jumbo wins contract with Ithaca for Installation of the Stella FPF-1 mooring system in the North Sea

Jumbo wins contract with Ithaca for Installation of the Stella FPF-1 mooring system in the North Sea

Jumbo signed a Contract with Ithaca Energy for the provision of the FPF-1 Mooring System Installation for the Greater Stella Area Development. Installation of the mooring system will be done by Jumbo's Fairplayer, a state of the art DP2 Heavy Lift Vessel with 2 x 900 MTon revolving deep-water cranes.

Read more