View media
Trackrecord

Ikhwezi Field Development

The scope of work comprised of the project management, engineering, pre-survey, preparations at FA Platform, loadout of 3” flexible MEG riser and protection/stabilization mattresses at Cape Town, offshore transport and installation(J-tube pull-in), protection and stabilization of MEG riser at FA Platform.

Download the Ikhwezi field development project specifications.

 

Share this page
  • Share this on Twitter
  • Share this on Facebook
  • Share this on LinkedIn
  • Send this by Email
  • Direct link

Offshore Construction vessel Fairplayer transports Ikwhezi equipment

Jumbo completes PetroSA contract for Subsea Installation of Ikhwezi MEG Riser

End of January 2015 Jumbo completed the Subsea Installation of the replacement MEG riser for the Ikhwezi Project at the existing FA Platform.PetroSA awarded this fast track execution contract on December 5th 2014.

Read more